TIMNATH RESERVOIR SHORELINE IMPROVEMENTS

TIMNATH, CO

The Timnath Reservoir project required building a 568-foot long retaining wall along the shoreline of Timnath Reservoir, which was then reinforced with riprap. It was the first large-scale modular retaining wall ECI had ever built with our own forces, and our crew worked diligently to ensure the project was finished before the water elevation increased quickly this spring.

Architect | Engineer – TST Inc., Consulting Engineers