ECCV EXPANSION AND SITE WORK

AURORA, CO

The purpose of the East Cherry Creek Valley (ECCV) project was to enhance and upgrade the stormwater system at the ECCV headquarters, as well as create a new maintenance building, parking, site utilities, MSE walls, concrete flatwork, and additional landscape and irrigation. The project included a 15-foot Redi-Rock Modular Block retaining wall with water quality pond directly adjacent to the top of wall, pre-engineered metal building with facility operations area, extensive underground site evaluation for existing wet and dry utilities, and several water quality treatment facilities.

Architect | Engineer – Muller Engineering